Tuesday, June 16, 1998

Archaeological Investigations of the McMartin Preschool Site, Manhattan Beach, California

Archaeological Investigations of the McMartin Preschool Site, Manhattan Beach, California
By E. Gary Stickel, Ph.D.
Santa Cruz Ritual Task Force - June 16, 1998


Executive Summary
During the month of May 1990 an archaeological project was conducted at the McMartin Preschool site to determine, once and for all, whether or not there had ever been tunnels under the building, as described by various children. Excavation was carried out according to established scientific conventions with a careful research design defining what might prove or disprove the existence of "an underground feature that would connect to the surface of the site and extend underground for some distance. " [with] dimensions large enough to accommodate adult human movement through it". (p. 24)

The project unearthed not one but two tunnel complexes as well as previously unrecognized structural features which defied logical explanation. Both tunnel complexes conformed to locations and functional descriptions established by children's reports. One had been described as providing undetected access to an adjacent building on the east. The other provided outside access under the west wall of the building and contained within it an enlarged, cavernous artifact corresponding to children's descriptions of a "secret room".

Both the contour signature of the walls and the nature of recovered artifacts indicated that the tunnels had been dug by hand under the concrete slab floor after the construction of the building. Whatever the purpose of this elaborate enterprise, even more effort must have been devoted to filling the tunnels back in and trying to conceal any evidence of their existence. Much of the fill dirt used for packing the tunnel spaces was mixed with historic debris, as if to mimic the surrounding terrain.

Not only did the discovered features fulfill the research prequalifications as tunnels designed for human traffic, there was also no alternative or natural explanation for the presence of such features.


Background
The McMartin preschool in Manhattan Beach, California was the first of what has since been described as a national epidemic of multi-victim, multi-perpetrator accusations of sexual and sadistic abuse which erupted in the mid 1980's. The McMartin case was encumbered with hundreds of charges against seven defendants and dozens of uncharged suspects. It became the longest, most expensive and arguably most controversial criminal trial in American history. The descriptions given by children to investigators and parents were unusual and unprecedented as they emerged in 1983, but they became so stereotypic to subsequent cases throughout the country as to become generic of presumed "ritual abuse". Accusations of such extreme cruelty and bizarre perversity in the absence of physical evidence or obviously deranged suspects led eventually to increasing skepticism that such crimes could possibly exist. Simple alternative explanations emerged, first as criminal defense theories and then as common wisdom: very young children were moved by the hysterical overreaction of various adults to make unfounded accusations. Full-page newspaper ads placed in 1984 by McMartin criminal defense attorneys raised the specter of the Salem witch trials. The witch hunt analogy has since flourished to create substantial public distrust of preschool-age witnesses and of the adults who question them.

The failure of prosecutors to obtain even a single conviction in the McMartin trial has been taken by many as proof that the children's allegations were merely fantastic. Various journalists have demanded punishment of the professionals and parents who had chosen to believe them. Similar allegations arising more recently in other cases in the United States and abroad are tested against the McMartin standard, creating a prejudice against investigating or substantiating even remotely "bizarre" complaints. Parents in such cases feel triply betrayed: first with the dreadful discovery of abuse; second with their abandonment by law enforcement, and third with being blamed for imagining the abuse and fomenting public hysteria.

One of the supposedly bizarre aspects of the McMartin case was the children's insistence that they were taken into underground tunnels. They explained that the tunnels led to an underground "secret room" where abuse occurred, as well as providing a route for subversive transport to off-site locations for sexual exploitation. These stories were apparently considered fantastic by investigators, who made no attempt to search beneath the building.

A group of parents forced the hand of the district attorney on March 17, 1985 by initiating an excavation in the adjacent lot. The district attorney then authorized an archaeological inspection of that lot by Scientific Resource Surveys Inc. (SRS). There was no exploration beneath the slab floor. Instrumental survey with a terrain conductivity meter failed to detect alterations under the concrete. The SRS technician informed the district attorney's investigator that the meter proved useless within the structure because of excessive interference from pipes and steel reinforcement. The preemptory conclusion at that time that there were no tunnels has become gospel among detractors of the McMartin families. Influential journalists ridicule parents for ever entertaining such a possibility and mock their subsequent attempts at exploration.

The first opportunity for private exploration came in April 1990 when the property was sold. Several parents obtained permission from the new owner to search for the tunnels. After cutting out a section of concrete and coming up with ambiguous findings, it became apparent that experienced supervision was needed. Gerald Hobbs, a professional miner, was engaged to insure safety and to better define the nature of the underground artifacts. When an apparent tunnel entrance was discovered and then verified by geologist Dr. E. Don Michael, parents sought out the archaeological team that completed the present project.


Method
The project was designed and conducted by E. Gary Stickel, Ph.D., on the recommendation of Rainer Berger, Ph.D., Professor and Chair of the Interdisciplinary Ĺ’Program of the Archaeology Department at UCLA. Dr. Stickel is director of Environmental Research Archaeologists, a Scientific Consortium(ERA).

Several areas of the preschool site were designated and mapped as units for scientific excavation. These were selected according to differing criteria: re-exploration of sites documented in the district attorney's SRS survey, children's reports of entrance locations, anomalies detected through instrumental survey by ground penetrating radar (GPR), and the sites of significant discovery under Mr. Hobbs' supervision.


Hypotheses and Test Expectations
The primary research problem was to determine whether or not there were a tunnel(s) and an underground room(s) at the site in question. To meet the test hypotheses, a tunnel would be an underground feature that would connect to the surface of the site and extend underground for some distance, possibly (but not necessarily) connecting to an underground room(s). It would have to have dimensions large enough to accommodate adult human movement through it. Such a tunnel on the subject property could have been constructed in two ways: 1) either dug out as a trench-like opening which would then be roofed over with wood and/or other materials and covered over with fill above to make a true tunnel (as opposed to an open trench), or 2) would be dug out completely underground, which would then leave a "ceiling" over its passageway formed of the naturally deposited soil. If the latter were the case, such a tunnel may or may not have been fitted with an underground "roof" of wood and/or other materials either to reinforce the strength of the "ceiling" of the tunnel or to keep loose soil and dust from falling down on people using it. In either scenario (l or 2) such a tunnel may have had posts of wood and/or other materials (e.g. iron) to serve as shoring reinforcements.

Thus, given the operational definition of a tunnel considered here, the following hypothesis and test expectations were considered (test expectations are specific, tangible data that are to be expected and are discoverable if the hypothesis is valid; Stickel, 1979).


If a tunnel(s) were present at the McMartin Preschool site, then the following test expectations should be present:
  1. An opening(s) (entrance and/or exit) large enough for human passage should be present permitting access from the surface down into a tunnel feature.
  2. Tunnel architecture should be linear or curvilinear (i.e. an elongated passageway leading in a definable direction(s).
  3. Tunnel architecture (especially depth or height and width) should be large enough to accommodate adult human passage.
  4. The walls and/or uncovered soil ceiling of the tunnel should have "signatures" of markings indicating whether the tunnel had been dug by hand and/or by a machine (e.g. a backhoe).
  5. There should be a compacted dirt floor (compacted by human foot traffic) distinguishable from surrounding non-tunnel soil which should not be compacted.
  6. The tunnel could be open (i.e. traversable and unfilled).
  7. The tunnel may be naturally (i.e. natural processes of erosion and soil redeposition) or artificially (by human action) filled in with soil. Such fill should be distinguishable from the natural soil matrix of the site in terms of color and/or by texture, and compaction (i.e. would be less compact than the soil forming the tunnel's walls, floor and ceiling).
  8. The tunnel fill may have inclusions of:
    1. Natural stones and/or other natural items or;
    2. Artifacts and/or ecofacts.
  9. Although a tunnel of the type sought in this project may not be directly datable (e.g. in contrast to a construction date molded into the concrete of a railroad tunnel), the tunnel may be dated indirectly by the dates on artifacts contained within it if any are present.
The test expectations for a subterranean room would be essentially the same as for a tunnel. The exception would be for test expectations 1, 2 and 3 above which would be modified to reflect necessary doorway(s) into a room, that the shape of the room would not be too linear (as a tunnel) but would be "room shaped", i.e. square, round, or ovoid, and that a room would be of sufficient dimensions (length, width and height) to be distinguishable from a tunnel passageway. A room would thus be of sufficient size to accommodate a number of people interacting in a face-to-face manner as opposed to a tunnel which (depending on its size) would provide restricted possibilities for human interaction. Since, on balance, one would expect human usage of a room to be more prolonged than in a tunnel passageway, artifacts catering to prolonged usage would be expected in such a room, perhaps in the form of chairs, couches, tables, a lighting system, etc. These expectations were borne in mind during our search of the site.

Initial surveys would be conducted with remote sensing instrumentation. The author's experience elsewhere predicted that Ground Penetrating Radar, rather than the terrain conductivity meter used in the previous survey, would be effective for anomalies beneath a concrete slab floor.


Findings
The profile of an entrance/exit tunnel was discovered under the foundation of the west wall of the building (Classroom #4, see map, p. 13, this summary). The signature of this feature was described and sketched by consulting geologist Don Michael, Ph.D. (p. 113). The feature was clearly distinguished by loose, disturbed soil and the artifacts contained within it. The outside margins had an inverted bell-shaped curve profile. The tunnel signature was established both by the sharp demarcation of soil color and texture, as well as by the exclusive presence within the cavity fill of assorted historic debris such as old cans and bottles, various metal fragments and small household items. The roof at that point was provided by the bottom of the concrete foundation. Inside the foundation a roof of soil was evident.

The profile was also demarcated by severed tree roots, the significance of which was described by professional tree surgeon Jerry Hobbs:

...running under the foundation from south to north was a large root which had been chopped off at the edge of where the large amount of cans, bottles, and plastic were being found. A growing root would have had to run in and through the cans and bottles but did not. The root, some 3" in diameter had been severed with a hand saw about 90% through, then pulled off, peeling the bark of the root. The peeled layer of the cambium layer had well established healing already in progress. New feeder roots had started to grow from the cut portion of the root, and attained lengths of 6" to 15". A space of 59" to the north the roots pick up again, only these had been chopped off from the larger root and were dead. [The dead root] was about 1" in diameter and continued in the same 30 degree angle as the other root, the cambium layer was separating from the rest of the woody part of the root, indication it was probably severed at the same time the green root that was attached to the tree was severed. Both the feeder root lengths and the healing of the cambium layer indicate that the root had been cut at a time of 4 to 6 years earlier. I feel my determination is accurate due to my experience of the planting and removal and care of some of the same kind of trees for more than 25 years. To me this is conclusive that with the inconsistent soil area, the plastic bag dated 1982 [see next paragraph] and the old bottles, cans and debris, were put in the ground after 1982, and it was not an old dump area as it appeared. (Appendix III, pp. 174-176)
A plastic sandwich bag was found under the foundation at a depth of 42" below the surface and 3-6" inside the wall line of the building. The bag was imprinted with Disney characters and the words: "©1982 Walt Disney Productions", along with a logo of a school house with "Disney Class of 1982/1983" underneath. These factors led Dr. Michael to conclude "therefore, the cavity could be no older than 1983" (p. 84).

Due to the crucial location and dating of the Disney bag as evidence of recent disturbance, alternate hypotheses were examined. Could the bag have been artifactual not of a clandestine, buried tunnel but rather incidental to the parents' March 1985 dig or to the subsequent SRS excavation commissioned by the district attorney? After careful analysis of the parameters of each excavation, Mr. Langenwalter, senior author of the SRS study, concluded that since the parents' backhoe trench was no less than 137" from the northwest corner, it is clear that the plastic Disney bag was located by Hobbs in the virgin area between the SRS excavation and the parents' dig. In fact, it was recovered 7" south of the parameters of the SRS excavation and approximately 13" north of the parents' backhoe trench (p.184).

The emphatic correlation of definitive observations for this tunnel entrance feature is especially significant in view of its location: the decision was made to explore this precise area because some of the children had stated that there had been animal cages placed along the wall and they had entered a tunnel under the cages at that point (cf. Langenwalter, et al, 1985: 13).

Excavations where conducted in the westernmost sector of Unit 1 in room #3. This site was selected because a GPR anomaly was detected through the concrete floor in an area next to and continuing up against the west dividing wall between classrooms #3 & #4. Several human-introduced artifacts were encountered adjacent to a 3 inch cast iron waste pipe running northward from the dig. The size of the artifacts ruled out their introduction by burrowing rodents (bioturbation) and their distribution was confined within a shallow, trench-like profile of different colored soil. This proved to be a mechanically dug trench to accommodate the waste pipe from the bathroom in classroom #3, as substantiated also by the signature characteristic of a backhoe. However, one aspect of the pipe and trench complex was uncharacteristic and unexplainable at the time of excavation: the stainless steel clamps connecting an angle of the waste pipe. These two clamps were notable in that they appeared to be brand new, with a very shiny silver color, lacking the patina expected of objects buried long underground. That apparent disparity of age or use became more apparent as other clamps were unearthed elsewhere, all of which were considerably etched and discolored. There was no opening through the concrete floor which could have allowed for access to these clamps after the floor was poured, and there was no explanation for their like-new appearance if they had remained buried for the life of the structure.

A possible tunnel feature was excavated from the toilet areas in classroom #1 and the office. This feature was distinguished clearly by the color and compaction of the interior soil, which was much darker and more loosely compacted. The feature appeared to connect the area beneath the office and classroom #1 and to proceed eastward toward the eastern, outer wall of the preschool. Mr. Hobbs made a number of ancillary observations, summarized as follows:

The children stated that they had entered a tunnel from the south east corner of room 1. We dug down along the east wall of room one and the bathroom. As we followed the disturbed area south, it went under the wall into the now existing bathroom, after about 6 feet it made an abrupt right turn to the east and headed for the neighboring property. The children had told two different stories about this tunnel prior to the dig. One, that they had gone through the tunnel and come up in the house next door and two, they had come up in the garage, which blocked the house from the street. At any rate the tunnel went in that direction. I went to the house next door and followed the walk between the school and the house which were only about 4' apart. I went under the house and bellied my way toward the southwest corner of the house. After going about 20' I found an area inside the west wall of the house where the floor was cut out. If I remember correctly the area of the floor that was missing was 36" by 38" or 41", you could reach up and touch the bath tub which was exposed. The plumbing in that area appeared to be quite new.

I went back to the school and continued to dig. The tunnel I had been following was now headed toward the corner of the house where I had found the hole cut in the floor. I was very close to the foundation of the house, I was sure, so I poked a hole up through to the surface. The hole I punched through was about 2' beyond the west wall of the house and about 1' outside the south wall of the house. This tunnel was in direct line with the cut out opening under the house.

In addition to the difference in soil composition, the tunnel feature was distinctive from the surrounding matrix and from some other tunnel features discovered later, in that it had been back filled with earth that contained virtually no large artifacts or ecofacts. It did contain numerous flecks of charcoal and carbon and pieces of plaster with green paint, which the excavators hypothesized might be the remnants of the green paint that had been applied to the school in 1984 or 1985 and possibly of the fire that had occurred within the building on April 8, 1984. The maximum depth of the feature was 6 feet, and its excavated length was over 26 feet. The feature fulfilled 4 of the 5 test expectations as a tunnel, lacking only a well defined roof contour.

Several units for study were established in the adjacent vacant property (sidelot) and in the play yard adjacent to the school building, in reference to both the prior archaeological project and anomalies detected by GPR. These digs turned up apparently irrelevant artifacts such as the cesspool of the earlier residence on the sidelot and some irregular chunks and slabs of concrete. A more surprising finding was the absence of toys or other playthings that would be expected from the use of the excavated area of the preschool play yard as a children's sand box. The only exception was a 3 inch plastic plate bearing three hand-drawn five-pointed stars of differing sizes. These stars were drawn by an adult with a careful and deliberate style inconsistent with childrens drawings.

The most definitive discoveries came to light through following the vein of artifactual debris from the tunnel portal under the west wall of Classroom #4. An apparent tunnel signature veered southward once inside the foundation. The width and direction were clearly indicated not only by the abundance of historic artifacts contained within it, but also the soil color of the fill matrix was distinctly darker than the surrounding natural soil. The average width of the tunnel feature was greater than 4 feet as it extended on the diagonal completely across Unit 1 and under the concrete floor to the western edge of Unit One.

Proceeding southward, the tunnel feature widened at one point to the extent that it appeared less tunnel-like and more like a room. Also at that point a layer of plywood roofing material along with tar paper and roofing nails was found at the top of the tunnel fill material. Underneath the plywood and tar paper was a continuing abundance of bottles, wood and other debris. It became obvious that this densely packed debris-filled area was quite large in relation to the tunnel passage previously described. This room-like feature extended southward to the area under the doorway to Classroom #4 and the sidewalk corridor beyond.

It was observed that the layer of plywood and tar paper, which may have served as a kind of roof for the room-like portion of the feature, continued in an arc to the east across the east side of the southeast corner of trench Unit 1. There were obvious soil color and density demarcation lines at the roof, floor and sides. The overburden of soil forming. The existing roof of the tunnel at that point was 22 inches thick (measuring from between the bottom of the concrete floor and the demarcation of the former tunnel cavity). The walls of this wider area bore shovel mark "scars". These "scars" indicated that the tunnel had been dug out with hand tools rather than mechanized equipment.

The depth of the tunnel in the room-like area was a little more than 6'8", which would have permitted most adult males to stand upright. In contrast, the depth of the tunnel in the passageway leading up to the room-like feature was more shallow, at an average of 5'11", which would have required most adult males to bend over when walking through the passageway.

A major artifact was found buried within the room-like feature: an intact rural, roadside style mailbox. This mailbox had the name and address of the last occupants of the house that stood on the adjacent lot until it was torn down in 1972.

The tunnel direction changed dramatically beyond the room-like area, turning to a "dogleg" headed acutely eastward. A crucial dilemma was imminent at this point. With only two days left to complete all excavation, there was not time to both explore the full dimensions of the possible room and to follow the ultimate extent of the tunnel. Although important data may well have been missed by not fully exploring the "room", it was considered more important at that time to redirect full effort to explore the tunnel. It was hoped that the more the tunnel feature could be defined, the more possibilities there would be for making correlations with the eyewitness reports of the children.

In digging out the tunnel fill eastward under the concrete floor, it became apparent that the line of the tunnel continued across Classroom #4 and into the cut through the floor at Unit 1. The width of the tunnel was still about 3 feet. The height of the tunnel feature was unlike the "room" area, returning to the 5 foot, 11 inch average height of the western passageway. Some boards and a few tin cans were still found in the tunnel fill within Unit 2 but they petered out until no more major artifact inclusions were encountered beyond about three fourths of the way across the unit.

The tunnel feature ran completely across Classroom #4, up to the foundation under the dividing wall. The overburden "roof" above the tunnel gradually diminished as the tunnel came closer to the surface until, at the point where the tunnel went under the concrete foundation, there was no soil overburden or roof. Consequently the bottom of the foundation intruded into the tunnel's roof at that point. At the precise width of the tunnel, at the point where it crossed under the dividing wall between Classrooms #4 and #3, the bottom of the concrete foundation was slightly arched. The depth of the foundation at the centerpoint of the tunnel passage was some 25 inches below the concrete floor. The depth of this foundation, which gave it enormous strength, is curious, given that it supported only a structurally insignificant secondary dividing wall between the two classrooms.

At that point it became obvious that the initial Ground Penetrating Radar survey had actually detected the tunnel at the locus of its crossing under the dividing wall. Indeed, the GPR was successful in detecting the tunnel feature on both sides of the dividing wall beneath the concrete pad floor. The two corresponding anomalies had been the reason to cut through the concrete pad floor to create Classroom #3, Unit 1 and Classroom #4, Unit 2 in the first place. And it was the reason the two units were directly aligned with each other, even though on opposite sides of a then-existing dividing wall.

An unexpected discovery was made in the tunnel directly under the foundation between Classrooms #4 and #3. Four large containers were found in situ standing upright and directly beside each other. Curiously, they were not found on the floor of the tunnel but had been placed on a de facto "platform" of fill halfway up to the arched foundation.

The four containers were comprised of two blue enameled metal cylindrical pots; one tall, cylindrical crockery pot; and one rusted cast iron cauldron. The smaller of the two metal pots had a loose, makeshift handle of twisted wire. The larger metal pot had one original looped metal handle still fixed to one of its sides. The crockery container, stamped "Red Wing Stoneware Co.", was of a glazed tan color and had a decoration of one cobalt blue leaf and three stems painted on one side.

Further work revealed that the tunnel ran completely under the dividing wall foundation arch and eastward under Classroom #3. Digging backward and downward, it was then possible to observe a profile of the tunnel feature. The bottom of the tunnel was slightly U-shaped and clearly distinguishable from the lighter natural soil matrix below, which unlike the tunnel fill, contained some lighter and darker-colored small areas of rodent burrow disturbances.

Just 12 inches eastward of the dividing wall foundation another profile was defined. The tunnel again had a "roof" of compacted overburden soil. Therefore an inverted U-shaped soil boundary was very clearly defined both in soil color and texture at the top of the tunnel profile.

Unlike the tunnel passages in Classroom #4, there were virtually no inclusions of artifacts in the tunnel fill within Classroom #3. Following the tunnel fill, the team reencountered the area of the metal waste pipe with the shiny pipe joiner clamps previously described. Following the tunnel fill eastward down trench Unit 1, it became apparent that the original tunnel virtually coincided with the size and length of the concrete cutout for that unit. This coincidence was the reason the tunnel was not discovered in the initial excavation of Unit 1. Digging downward precisely within its margins, it had been impossible to visualize the lateral signature of the tunnel.

Summarizing the excavation under Classrooms #3 and #4, there was a clearly defined tunnel whose data conformed to virtually all of the test expectations for the discovery and identification of such a tunnel. Indeed, it had been possible to follow the orientation of the tunnel for some 22 feet in Classroom #4 and for an additional 28 feet where it went in an east/west direction across Classrooms #4 and #3. Thus the explored portion of the tunnel extended for a total of more than 50 feet.

With what little time there was left, attention was directed to Unit 3 of Classroom #3, which contained the intriguing remains of wooden posts. These were found in situ, still in upright positions. Both posts were the remains of 4 x 4" timbers. The first one had been burnt. The second post was more intact, and only slightly burnt. Due to their relationship parallel to the east wall of the preschool and relative to wood fragments to the north in Unit 2 found earlier by Jerry Hobbs, these posts seemed to be spaced at regular intervals, extending from north to south in classroom #3. They may have been part of a shoring system for an underground passageway, but there was no longer any time to explore for corroborative evidence.

In addition to discoveries underground, there were observations within the building itself which remain unexplained. A stack of twenty or more unused, light brown asphalt tile, appearing to be exactly the same as the tile used throughout the entire interior floor of the preschool, was discovered in the cupboard under the kitchenette sink in the office (p.181). This discovery raised the question of whether or not the floor had been patched, or perhaps replaced in its entirety. Several sections of tile had been removed by the District Attorney's investigators in 1985 but the black mastic under the tile remained on the concrete slab. In order to check the preschool floor thoroughly for any patches or replaced areas of concrete, all of the tile would have to be removed and then the mastic would have to be sandblasted or chemically removed. Because of financial and time constraints, these ideas were quickly abandoned in favor of trying to locate and identify any tunnels or rooms under the school.

Several days into the project one of the workers noticed that Classroom #3 did not have a door knob (p.182). Instead, there was a single cylinder dead bolt with a flip latch on the inside, with only a keyhole on the outside. Once latched from the inside, there could be no entry to this classroom without a key. The face of this door was obscured from outside view due to its placement within the inside corner of the L shape of the building, recessed behind the north wall of Classroom #2. The absence of any exterior knob was thus undetectable whenever the door was open, since the face of the door backed onto the deadend of the hallway.

Several parents remembered that when they were present at the school during operating hours, the door had always stood open. A mother who had occasion to visit with her two-year-old son stated that whenever she was there the toddler would run into the vacant room and reach for the children's paint and brushes. The child did this several times and each time the director would scold the mother and tell her it was not safe to let her baby go into the room because there were too many things he could get into. Yet the door was never closed.


Conclusions
The project determined the existence of two extensive tunnel complexes beneath the concrete floor of the McMartin Preschool building. One, toward the south, was consistent with the location and function described by children; it appeared to connect the interior of the preschool with the adjoining triplex structure and it had a distinct signature where it exited under the foundation of the east wall. Since it lacked dateable artifacts and a consistent demarcation of floor profile, it was classified conservatively as a "possible" tunnel.

The feature that conforms scientifically to the predetermined attributes as a tunnel was the complex on the north. This tunnel feature was clearly distinguished from the other subsurface features encountered during our excavations at the site. The northern tunnel feature conformed to virtually all of the test expectations, as follows:
  1. An identified entrance;
  2. The architecture was both linear and slightly curvilinear;
  3. The architecture was large enough for adult human passage;
  4. There were characteristic scars indicating that it had been dug by hand;
  5. The feature had a compacted dirt floor;
  6. The tunnel was found not open;
  7. The tunnel had been completely, artificially filled in with fill which was distinguishable on the basis of color, texture and compaction from the original soil depositat the site;
  8. The fill contained inclusions in the form of a large number of artifacts;
  9. The probabilistic dating of the tunnel can be estimated by recovered artifacts.
The following seven factors determine probable age. First, it is unlikely that the bright, stainless steel straps had been placed on the pipe in 1966, when the structure was built. Second, the placement of the mailbox most probably dates to the time following the destruction of the neighboring house in 1972. Third, the Disney bag has a date of 1983, which indicates that the tunnel fill dates to that time or thereafter. Fourth, the arching of the foundation precisely over the tunnel was obviously a feature made to accommodate the tunnel and there is no other conceivable scenario to account for it. Fifth, the four large containers which were placed by hand into the tunnel fill indicate the use of the tunnel after the preschool was built. Given their position under the foundation, there is no possibility that they would not have been knocked out of place and their intact glass bottle and jar contents broken when the trench was excavated in 1966 for the pouring of the concrete foundation. Sixth, the ceiling of the tunnel was simply too shallow to have withstood human foot traffic on it in an unprotected state. If the tunnel feature had existed prior to the construction of the preschool, its covering or roof would have been so shallow that a person walking on the surface would have easily caved it in, thus exposing the tunnel. Finally, the soil deposit at this part of the property had been put into place and compacted at the time of the building construction. Therefore any holes or openings found in that area extending up to or near the surface would necessarily date to a time after 1966.

Therefore, given the evidence of the seven factors above, the time of the construction and use of the tunnel postdates 1966.


Summation
This report describes the efforts of a group of parents to explore the meaning of several issues raised by their children after attending the McMartin Preschool. Reports of the existence of underground passageways had not been confirmed in the limited exploration conducted by the office of the District Attorney. At the first opportunity of private access to the preschool property, these parents secured permission from the new owner to search more extensively for pertinent information. By engaging a highly recommended professional archaeological team, they hoped to bring scientific authority to whatever might be found or a definitive resolution for whatever was not to be found.

The present project started where the earlier investigation left off, re-examining the previous digs outside the school structure, using new technology to survey for possible anomalies beneath the floor of the structure, and then actually cutting through the concrete floor and scientifically evaluating the consistency and integrity of the underlying soil.

The results of the survey by Ground Penetrating Radar proved consistent with discoveries of the subsequent excavations, all of which confirmed not only the basic descriptions of children but also specific details of location, interior features and putative function.

The McMartin Tunnel Project confirms that a functional pattern of tunnels once existed under the McMartin Preschool, that the tunnels provided access outside the walls of the structure, that they must have been constructed after the structure was built in 1966, and that they were subsequently completely repacked with extraneous soil and implanted artifacts at some time prior to May, 1990. While this project had no way of determining who dug these tunnels, or for what purpose, the discoveries stand in stark contrast to the skeptical position that the children only imagined what they described as activities underground.

If the stories of the children were bogus fantasies, there is no excuse for the tunnels discovered under the school. If there really were tunnels, there is no excuse for the glib dismissal of any and all of the complaints of the children and their parents.

References
  • Langenwalter, Paul E., Kevin Peter, Jane King, and Robert Beer, 1985. Report on a forensic archaelogical investigation conducted at the Goldstein property at Manhattan Beach, California. Report prepared for the Los Angeles County District Attorney. Unpublished report on file at the contracted firm of Scientific Resource Surveys, Inc., Huntington Beach, California, and at the Office of the District Attorney.
  • Stickel, E. Gary, 1979. More on Theory Building in Archaeology. Current Anthropology, Vol. 10, pp. 621-622.


Monday, June 01, 1998

Sibling Incest, Madness, and the "Jews"

Sibling Incest, Madness, and the "Jews"
By Sander L. Gilman
Social Research, Vol. 65, No.1 (Summer 1998),  pp. 401-433

How does one organize the categories that we call "deviance"?  To examine the nosology of the deviant in modern (post-Enlightenment) culture one is constrained to use categories of analysis that arise in the spheres of law, medicine, and the social sciences.  That is, the history of deviance in popular and high culture comes to be the reworking of "scientific" categories of difference that overlay the fantasies of the difference, often more complex and more far-reaching than the models themselves.  Incest is just such a category of deviance in modern culture.  One of the most interesting phenomena in the intense, public debate over the past decade about child abuse and incest is the virtual absence of sibling incest as a topic of concern (1).  Ian Hacking has explored the history and philosophy of memory / false memory and the literature on child abuse in the context of the modern fascination with multiple personality (Hacking, 1995).  The object that he is studying simply does not center on sibling incest because the contemporary debate on multiple personalities and abuse do not seem to focus on this problem.  However, it was a question that dominated the debates on incest in precisely the period in French culture from 1874 to 1886 that Hacking quite correctly sees as the period in which the concatenation of relationships he is exploring is made first.  Sibling incest was touchstone for the incest and inbreeding discussion of the late-nineteenth century and one of the often cited "social problems" of that day.  


Saturday, May 16, 1998

Case of Rabbi Max Zucker

Case of Rabbi Max Zucker

 
New York, NY
Dalton, GA (1950's)
North Miami Beach, FL
Governor's Commission on Human Rights - Knoxville, TN
National Conference of Christians and Jews - Knoxville, TN 
Congregation Tiferet Israel - Dallas, TX (1969)
Congregation Agudath Jacob - Waco, TX (1987)
Temple Anshi Shalom - Delray Beach, FL
Miami Beach, FL - (Retired)

 
Accused of molesting three women when they were children.  On May 17, 1998, Rabbi Max Zucker made a public apology to the women.
 
In Tennessee, he served on the Governor's Commission on Human Rights and as head of the Knoxville Round Table of the National Conference of Christians and Jews; while in Dallas, he presided over the local association of rabbis and the Texas Kallah of Rabbis.
 
In news stories over the years, Rabbi Zucker often talked about children and service to youth. "I'm a hard disciplinarian in theory," he told the "Knoxville News-Sentinel" in 1962. "Actually, in practice, my own idea is to make children like me ... In Dalton, they called me their Pied Piper." 

Rabbi Zucker passed away six months after apologizing for the sexual assaults.

_____________________________________________________________________________________

Disclaimer: Inclusion in this website does not constitute a recommendation or endorsement. Individuals must decide for themselves if the resources meet their own personal needs.
 

1998 
  1. Three women accuse ex-Dallas rabbi of molesting them as girls  (05/16/1998)
  2. 3 women accuse rabbi of molestation He offers apology for one 'mistake,' doesn't recall other incident  (05/16/1998)
  3. Rabbi seeks forgiveness  (05/17/1998)
  4. Rabbi apologizes after sexual abuse allegations (05/19/1998)A former rabbi accused by three women of improper touch  (05/20/1998)
  5. Synagogue hires lawyer for inquiry Women say rabbi offered little help in abuse case (05/20/1998)
  6. Rabbi Max Zucker, former Tiferet Israel leader, dies at 74 (10/09/1998)
  7. Services held for Rabbi Max Zucker, formerly of Heska Amuna (10/10/1998)
  8. Over 200 attend services for Rabbi Max Zucker (10/10/1998) 
  9. OBITUARIES (10/15/1998)

_____________________________________________________________________________________ 

By Brooks Egerton
The Dallas Morning News - May 16, 1998, Saturday

DALLAS -- Three women have accused a prominent former Dallas rabbi of molesting them as girls, joining a small but growing number of people around the country alleging sexual misconduct by some Jewish religious leaders.
 
One of the women, (Name Removed), said Rabbi Max Zucker, the longtime head of Congregation Tiferet Israel, begged her forgiveness when she confronted him recently in the presence of her husband and parents.
 
Rabbi Zucker acknowledged this week that he apologized to (Name Removed) for a "mistake" he made nearly three decades ago.
 
"I touched her; I didn't fondle her," he told "The Dallas Morning News." Asked to elaborate, the rabbi said: "It doesn't matter. I apologized to her, and it's a closed story."
 
(Name Removed) and her relatives said Rabbi Zucker did not dispute her account that he touched her genitals. Instead, she said, he responded to her specifics by saying, "That was a very dark chapter in my life, and now God is punishing me."
 
In his telephone interview with "The Dallas Morning News," Rabbi Zucker sometimes denied improper touching and sometimes said he couldn't recall any. He said he's suffering terrible pain from prostate and bladder cancer that has spread to his bones, plus a torn shoulder.
 
"You know, thousands of children came into my office to be taught," said the 73-year-old rabbi, who retired two years ago in suburban Miami after more than 40 years in synagogues around the South. "And who remembers?"
 
Those children, he said, would sit on his lap. There behind his desk, his three accusers said, is where he repeatedly molested them, at ages 11, 12 and 13.
 
"I was the Pied Piper," said Rabbi Zucker, a father of four. "All the kids used to come around here I used to play ball with them, I would teach them, I made a choir, I bought them robes. So we were close ... But this other business is ridiculous.
 
"All I can say is, if anybody ever said that I made an approach which was inappropriate, okay, my deepest, my sincerest apologies. I beg their forgiveness. I don't recall any such thing ever happening. If they imagined it or if it was fact, I'm certainly sorry."
 
ABUSE IN ALL FAITHS
The three accusers _ (Name Removed), a 41-year-old Denver resident; (Name Removed), 38, of Dallas; and (Name Removed), 37, of Dallas said too many Jews think problems like sexual abuse happen only to non-Jewish people.  "They're the last of the religious communities to come forward," said the Rev. Tom Economus, a Chicago priest who heads a national organization of clergy-abuse victims. "I've talked to a lot of Jewish people who think this is just a Roman Catholic problem."
In fact, experts said, it occurs in all faiths. The typical pattern: A charismatic man of the cloth takes advantage of a child or a particularly vulnerable woman, who generally shies away from reporting the abuse.
 
"There's a myth in Judaism that nothing bad happens in Judaism," said Abigail Grafton, a Bay Area psychotherapist. She's helping staff a toll-free number (1-800-528-2672) that counselors set up to coincide with a recent article on rabbinical abuse in the Jewish women's magazine "Lilith." "We're getting calls from all over the country" from women who've been abused, Grafton said. "It's been extremely enlightening."
 
"Lilith" editor in chief Susan Weidman Schneider said her next issue will have six pages of letters responding to the article, which aired far-reaching molestation and sexual harassment allegations against a deceased New York rabbi, Shlomo Carlebach.
 
Reaction fell into three camps, she said: angry disbelief that the revered man was capable of such evil; "It happened to me, too"; and "So what? Everyone knew he was like that."
 
The women accusing Rabbi Zucker said the magazine article affected them deeply. It described the New York rabbi as charismatic in life and canonized in death, protected by silence.
 
Said (Name Removed) of Rabbi Zucker: "I don't want him eulogized only as a good man."

 
NO WIDESPREAD COVER-UP
The rabbinical abuse reports surfacing in the last few years generally haven't involved allegations of prolonged institutional cover-up, unlike hundreds of pedophile priest cases that date back more than a decade.
 
Rabbi Zucker's accusers said they know of no evidence that anyone at Tiferet Israel other than the rabbi and themselves knew about their abuse.
 
But the women did say that the congregation's current spiritual leader, Rabbi Yitzchak Cohen, has offered them little aid and seemed unwilling to investigate _ complaints that echo those made by many victims of priests.
 
They decided to talk to a newspaper reporter, they said, only after trying for months to get help from the synagogue they once attended.
 
(Name Removed) said Rabbi Cohen refused to bar Rabbi Zucker from officiating in good standing at a recent wedding here. And he also has refused, she said, to notify Rabbi Zucker's many former congregations of the allegations.
 
"I don't think it was my position to do that," Rabbi Cohen said. The reason, he said, is that "nothing has been proven." He acknowledged he had never asked Rabbi Zucker, with whom he long served as a cantor, whether the abuse accusations are true.
 
During Rabbi Zucker's return to Dallas for the wedding, he said, "I did not have a chance to talk to him."
 
Later in an interview, Rabbi Cohen said: "Nothing was said because they were only accusations at the time. It wasn't the time or the place."
 
He pledged that his congregation's leadership "will do anything in our power" to help the three women who've come forward to heal. "If it did happen, we feel very, very sad for the so-called victims."

 
SIMILAR EXPERIENCES
The rabbi's accusers have not been close over the years and said they learned of one another's similar experiences last fall.
 
That's when (Name Removed) told Rabbi Cohen that Rabbi Zucker had molested her when she was 13, and he responded by saying that he'd heard of (Name Removed) making similar allegations. (Name Removed) called (Name Removed), who then met with Rabbi Cohen and asked for help in learning whether other girls had also been abused.
 
Weeks later, (Name Removed) said, she ran into (Name Removed), recognized her as someone who'd been close to Rabbi Zucker and told her that abuse allegations might become public.
 
"I just broke down," said (Name Removed), whose wedding was conducted by Rabbi Zucker. "I'd never told anyone."
 
The three women give different reasons for keeping quiet so long: (Name Removed) didn't want to hurt such an esteemed man _ a man who was close to her parents and "like a father to me." (Name Removed) didn't want to cause trouble for the man her mother served as a secretary. (Name Removed) feared she wouldn't be believed and repressed her memories.
 
Finding out that they weren't alone, they said, changed everything.
 
"The only reason we're coming forward is because we know there are other women out there," (Name Removed) said. "They need to get counseling. They need to deal with this."
 
The women said they aren't suing, seeking financial compensation or looking to send Rabbi Zucker to jail. Their deadline for pressing charges expired long ago.
 
"It's not about money," (Name Removed) said. "There isn't enough money in the world."

 
CAREER IN THE SOUTH
Rabbi Zucker's career took him from Dalton, Ga., in the 1950s to North Miami Beach, Knoxville, Tenn., and then Dallas in 1969.
 
After nearly two decades here, the New York City native moved to Waco (Texas) in 1987 and became the leader of Congregation Agudath Jacob. He returned to the Miami area in the early 1990s, working at Temple Anshei Shalom in Delray Beach.
 
Rabbi Zucker has been deeply involved in civic and religious associations. In Tennessee, he served on the Governor's Commission on Human Rights and as head of the Knoxville Round Table of the National Conference of Christians and Jews; while in Dallas, he presided over the local association of rabbis and the Texas Kallah of Rabbis.
 
In news stories over the years, Rabbi Zucker often talked about children and service to youth.
"I'm a hard disciplinarian in theory," he told the "Knoxville News-Sentinel" in 1962. "Actually, in practice, my own idea is to make children like me ... In Dalton, they called me their Pied Piper."


_____________________________________________________________________________________ 

3 women accuse rabbi of molestation He offers apology for one 'mistake,' doesn't recall other incident 
By Brooks Egerton
Dallas Daily News - May 16, 1998

ABSTRACT:
One of the women, (NAME REMOVED), said Rabbi Max Zucker, the longtime head of Congregation Tiferet Israel, begged her forgiveness when she confronted him recently in the presence of her husband and parents. 

Rabbi Zucker acknowledged this week that he apologized to (NAME REMOVED) for a "mistake" he made nearly three decades ago. 

(NAME REMOVED)  and her relatives said Rabbi Zucker did not dispute her account that he touched her genitals. Instead, she said, he responded to her specifics by saying, "That was a very dark chapter in my life, and now God is punishing me."

_____________________________________________________________________________________ 

Rabbi seeks forgiveness 
Dallas Daily News - May 17, 1998

ABSTRACT:
Rabbi Max Zucker, the longtime head of Congregation Tiferet Israel, begged for forgiveness when confronted recently by Bonnye Weinstein Garman of Denver, The Dallas Morning News reported in a copyright story for Saturday editions.  

_____________________________________________________________________________________ 

Rabbi apologizes after sexual abuse allegations
Miami Herald - May 19, 1998

ABSTRACT:  

_____________________________________________________________________________________  

A former rabbi accused by three women of improperly touch
The Associated Press - May 20, 1998
 
DALLAS - A former rabbi accused by three women of improperly touching them decades ago apologized for "a very dark chapter in my life".
 
Rabbi Max Zucker, the longtime head of a synagogue begged for forgiveness when confronted recently by one of the women he is accused of touching. The woman, her husband and parents said Zucker, 73, did not dispute her account that he touched her genitals.
 
In an interview, Zucker sometimes denied improper touching and sometimes said he couldn't recall any. The three accusers - all middle-aged women - told the newspaper Zucker repeatedly molested them when they were between 11 and 13 years old. "I beg their forgiveness," Zucker said. "I don't recall any such thing ever happening. If they imagined it or if it was fact, I'm certainly sorry."
 
Meanwhile the synagogue's board has hired a lawyer to examine how its current rabbi responded to the allegations against his predecessor and longtime associate, officials said.
 
When the women went public they said that Rabbi Cohen seemed unwilling to investigate and offered them little help. He disputed that assertion but acknowledged that he never confronted Zucker and recently allowed him to perform a wedding at the synagogue. 5/20

 
_____________________________________________________________________________________ 

Synagogue hires lawyer for inquiry Women say rabbi offered little help in abuse case
Dallas Daily News - May 20, 1998

A spokesman said Congregation Tiferet Israel wants to learn from events of the last several months, when three women told current Rabbi Yitzchak Cohen that retired Rabbi Max Zucker had fondled them as girls nearly 30 years ago. 

The women went public with the accusations last week in The Dallas Morning News , saying that Rabbi Cohen seemed unwilling to investigate and offered them little help. 

He disputed that assertion last week but acknowledged that he never confronted Rabbi Zucker and recently allowed him to perform a wedding at Tiferet Israel. Rabbi Zucker has admitted a "mistake" with one girl, while alternately denying other misconduct and saying he couldn't remember any. 

_____________________________________________________________________________________ 

Rabbi Max Zucker, former Tiferet Israel leader, dies at 74
Dallas Daily News - October 9, 1998

ABSTRACT:

Rabbi Max Zucker, the former longtime head of Congregation Tiferet Israel in Dallas, died of cancer Thursday in Miami Beach, Fla. 

Rabbi Zucker, 74, retired two years ago after working more than 40 years in synagogues throughout the South.
 
_____________________________________________________________________________________ 

 Services held for Rabbi Max Zucker, formerly of Heska Amuna
 News Sentinel - October 10, 1998

Services were held Friday in Dallas for Rabbi Max Zucker, who died Thursday of cancer in Miami Beach. 

He was 74. 

From 1962 to 1969, he led the congregation at Knoxville's Heska Amuna Synagogue. 

While in Knoxville, he chaired the Knoxville Round Table of Christians and Jews and chaired the executive committee of the Community Action Committee. 
 
Also, he served on the Governor's Commission on Human Rights. 

In addition, congregation members remember Rabbi Zucker's love of children. 

He taught religious study classes, and children took well to his teachings and loved him, several members of Heska Amuna said. 

After leaving Knoxville, Rabbi Zucker headed congregations in Dallas and Waco, Texas, and in Miami. 

He is survived by his wife, Vivian, and four children. 

_____________________________________________________________________________________ 

Over 200 attend services for Rabbi Max Zucker
Dallas Morning News - October 10, 1998

ABSTRACT:
More than 200 people gathered Friday for graveside services to honor Rabbi Max Zucker, retired head of Congregation Tiferet Israel in Dallas. 

Rabbi [Howard] Wolk lauded Rabbi Zucker's work with civil rights in the 1960s and noted the growth of his Dallas congregation during 17 years of leadership at Congregation Tiferet Israel, which he led until 1986.
 
_____________________________________________________________________________________ 

OBITUARIES
News Sentienel - October 15, 1998

ZUCKER, RABBI MAX - succumbed to prostate cancer after a three year battle, in Miami Beach, Fla., on Thursday, October 8th. Graveside services were held Friday, October 9th, honoring Rabbi Zucker, retired head of Congregation Tiferet Israel in Dallas. "He was known as a teacher par excellence," said Rabbi Howard Wolk of Shaare Tefilla, at the service held in the Beit Olam section of Hillcrest Memorial Park. "He influenced many young rabbis and very active laymen in the Jewish community here and in other cities." Rabbi Wolk lauded Rabbi Zucker's work with civil rights in the 1960's and noted the growth of his Dallas congregation during 17 years in leadership at Congregation Tiferet Israel, which he led until 1986. In 1975, Rabbi Zucker started one of the most popular programs for Jewish education, now called the Joys of Jewish Learning at the Jewish Community Center. Rabbi Zucker is survived by his wife of 49 years, Vivian; sons, Bruce, Michael, and Shayne; a daughter, Debbie; and 19 grandchildren. In lieu of flowers, the family requests donations be made to the "Rabbi Max Zucker Scholarship Fund for Youth" set up at Congregation Shaare Tefilla. Please send contributions to Congregation Shaare Tefilla, 6131 Churchill Way, Dallas, TX 75230. Earmark "Zucker Scholarship Fund."


_____________________________________________________________________________________ 

FAIR USE NOTICE
Some of the information on The Awareness Center's web pages may contain copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. 
 
We believe this constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. 
 
For more information go to: http://www.law.cornell.edu/uscode/17/107.shtml . If you wish to use copyrighted material from this update for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner.

_____________________________________________________________________________________